Crane setting a module on a prefabricated multi-unit building under construction in Quebec
Turnkey prefabricated multi-unit construction, from site assessment to key handover

Prefabricated multi-unit housing.Faster. Better built.

60-day turnkey delivery (12-plex example)
Guaranteed fixed price*
Available across Quebec today
~85% factory-built, CSA A277 certified
Video

9 homes in 1 day

June 2, 2026

A single turnkey partner, from start to finish

Our turnkey multi-unit housing: from land to keys, one team, one price, one timeline.

Most modular companies manufacture modules. We deliver buildings. 8Module coordinates every stage of your multi-unit housing project under one roof: site assessment, urban planning, engineering, factory production, transportation, assembly, finishing, and handover. You have a single point of contact instead of a dozen subcontractors to manage.

01

We assess the feasibility of your property

You provide the site, and we'll analyze it: size, zoning, access, utilities, and optimal modular layout.

02

We build in the factory while your site is being prepared

Parallel construction means that your modules are manufactured indoors while the foundation and utilities are being prepared on-site. No waiting. No weather delays.

03

We'll deliver it and hand you the keys

From crane assembly to final inspection, commissioning, and occupancy—we stay until you move in.

The 8Module standard

The 8Module standard: a specification built for prefabricated multi-unit housing

8Module is an integrator. We don't own a factory, and that's our strength: we only work with manufacturers who meet our specification. What makes our modular buildings quieter and more durable isn't modular construction itself, it's the 8Module specification: acoustic membranes, reinforced connections, and materials and standards designed for multi-unit housing. Single-family modular homes aren't in the same league as our modular multi-unit construction. Our goal: to make our standard the industry standard.

Quebec modular certification 2026 seal
Why choose 8Module?

Why choose 8Module in Quebec

We're the only turnkey modular construction integrator in Quebec dedicated to multi-unit housing, managing every step from land to keys under a single contract.

Crane lifting a module onto a 12-plex during the 4-day assembly
01
4 days
4-day assembly (12-plex baseline)
Modules arrive by truck, are lifted by crane onto prepared foundations and are connected in just a few days — not months. Your building goes from the factory floor to a standing structure in less than a week.
02
Fixed price*, locked in at signing
No extras. No cost overruns. Your budget is confirmed before work begins, so your financial plan holds from start to finish.
03
50% faster than conventional construction
Factory production and site preparation happen in parallel. What takes 14-18 months with conventional construction takes about 8 months with us (100 to 150 units). Timelines vary depending on project size.
04
One team, fully accountable
Support for plans, site layout and permits, engineering, production, logistics, assembly, finishing and key handover — coordinated by a single integrated team. You don't manage subcontractors. You manage one relationship.
DesignPermitManufacturingAssemblyDelivery
50% fewer GHGs
Built sustainably
Factory construction generates half the greenhouse gas impact of traditional on-site delivery, with less waste and better long-term energy performance.
50% fewer greenhouse gas emissionsEnergy efficientMinimal wasteBuilt to last
Learn more about sustainability
How it works

Factory-built. Assembled on your land. (12-plex)

Wk 1
Wk 2
Wk 3
Wk 4
Wk 5
Wk 6
Wk 7
Wk 8
Feasibility and Design
Permitting
Factory production
Site preparation
Assembly and installation
Key handover
See the full delivery process
How it works

Factory precision, delivered turnkey.

Each module is fully built indoors — structure, insulation, HVAC, electrical, plumbing, kitchen, bathroom and finishes — then transported as a whole and lifted by crane onto your prepared foundations. The result: a precision-built, move-in-ready building, delivered in a fraction of conventional timelines.

Exploded view of stacked modules forming a modular building
Factory-finished kitchen in an 8Module modular apartment
The result

Factory precision delivers finishes that match or exceed conventional construction, with CSA A277 certification.

Controlled manufacturing conditions eliminate weather damage, reduce material waste and allow tighter quality control at every step. The buildings we deliver aren't a compromise — they're an upgrade.

FAQ

Frequently asked questions about prefabricated multi-unit construction

Straight answers to the most common questions about modular multi-unit construction in Quebec.

Modular construction means manufacturing complete housing units inside a factory under controlled conditions, then transporting them to your site for rapid assembly. It's faster, more precise and produces less waste than conventional methods.

There are three main families of off-site construction. Volumetric modular delivers three-dimensional boxes that are 85% finished in the factory; that's what 8Module does. Panelized (2D) prefabrication delivers flat walls and floors that are assembled on site. Hybrid combines the two: volumetric modules for kitchens and bathrooms, panels for the rest. The more work done in the factory, the shorter the site phase and the more predictable the schedule. [See our delivery process](/processus).

According to the Société d'habitation du Québec, the minimum construction cost for an affordable housing unit ranges from $280 to $325 per square foot in 2026, excluding land. That figure varies with the region, zoning, building complexity and number of units: a 24-plex spreads its fixed costs over more units than a 6-plex. At 8Module, the price is fixed* and locked in at signing, based on a feasibility assessment of your land.

Our pricing is fixed* and locked in when the contract is signed. No change orders, no surprises: your budget is confirmed before the first shovel hits the ground, and only force majeure can change the terms. The fixed price excludes land, excavation and transport beyond 100 km from Montreal or Quebec City. Early project costs (urban planning, architecture, preliminary studies) can be credited against the total price if you sign with us.

There are three real constraints. Transport limits module width and requires site access a crane can work with. Design decisions happen earlier: once factory production starts, changes are expensive. And financing has to follow a different draw schedule than conventional construction, since most of the value is created in the factory before anything reaches the site. In return, the schedule and budget become predictable, and quality no longer depends on the weather.

A typical multi-housing project goes from signed agreement to move-in ready in about 8 months for a 100- to 150-unit project; timelines vary with size. On-site assembly takes as little as 4 days for a 12-unit building. The speed comes from running factory and site work in parallel. The step-by-step detail is on the [modular construction process](/processus) page.

We deliver 6-plex, 12-plex, 24-plex and 100+ unit configurations. The right format depends on the size of your land, zoning and your goals — we help you figure it out during a feasibility assessment.

You file the permits with your municipality. 8Module manages the full delivery: engineering, production, logistics, assembly with our RBQ-licensed crews and key handover. We provide all the technical documentation (plans, engineering reports) your municipality requires for your permit application. You work with one team, not a dozen subcontractors. See the [modular construction process](/processus) for the stage-by-stage detail.

We're based in Quebec with factory production capacity serving projects across the province, and we're expanding throughout Canada.

Let's build together.

Discover the 8Module standard

Whether you have land ready or an early-stage idea, we can help you assess the opportunity and map a realistic path to delivery — starting from a preliminary baseline cost.

*Fixed price: Excludes land, excavation, and transportation exceeding 100 km from Montreal or Quebec City.