For real estate investors

From signed contract to rental income — faster.

For your next rental building, fixed-price* factory-built delivery compresses the timeline and protects your pro forma from cost overruns.

8Module modular multiplex
8months
To first rental income
0%
Cost overrun risk
2x
Faster than traditional construction
CSA A277
Certified quality
Your challenges

Every month of construction delay is a month without revenue.

Conventional construction of a multi-unit rental building takes 14 to 18 months, exposes your budget to extras and forces you to manage multiple trades with competing priorities. The gap between investment and return is longer and less predictable than it should be.

Real estate investor's desk with return charts, a calculator, a laptop and a set of keys
2x
Revenue starts much sooner
Every month of construction delay is a month without rental income.
02
Cost overruns shrink returns
Fixed-price* contracting eliminates extras exposure.
03
Tenant appeal starts at construction
Energy-efficient, factory-precise units attract quality long-term tenants.
How 8Module helps

A modular income property: compressed timeline, locked-in costs, earlier revenue.

2 months to occupancy capacity (12-unit building)
Parallel factory and on-site work significantly compresses delivery of your rental building, so you reach first rental income faster.
Fixed price* protection
Your budget is locked when the contract is signed. No extras, no material escalation. The pro forma holds.
One partner, full accountability
Design, permits, production, logistics, assembly and key handover: a turnkey multi-unit building managed by a single team. No vendor juggling.
Factory quality that keeps tenants
Factory precision, better insulation and enhanced soundproofing produce units that attract and retain tenants.
Get started

Get a quote for your next project (within 5 business days).

Share your investment parameters and we'll outline the schedule, pricing structure and delivery path for a modular build.

2 months to first rental income (12-unit building)
0% cost-overrun risk
2.5x faster than conventional
CSA A277 certified quality
Target project size
Preferred timeline
FAQ

Frequently asked questions from real estate investors

Pricing, return timeline and scaling: the questions investors ask before committing to a project.

You receive a price locked* at contract signing covering the full delivery — design, production, assembly and key handover. There are no extras. Your investment thesis holds.

Yes. Our platform is built for repeatable deployment. Once the model is validated on one project, scaling to other sites uses the same process, the same team and the same pricing structure, once the contract is signed.

With our compressed delivery model, most projects reach occupancy capacity within 2 months (12-unit building) of the start of the assembly phase — significantly faster than the typical 6-7 months of conventional construction.

We build multi-unit buildings of 6, 12, 24, 50 and 100+ units, in 3½, 4½ and 5½ layouts. You can start with a 6-plex, then repeat the same model on other lots with the same team and pricing structure. A 6-plex needs about 10,000 sq. ft. of land, depending on zoning.

The fixed price* is locked at signing and covers full delivery: design, factory production, assembly and key handover. There are no extras and no material escalation. Only transport beyond 100 km is excluded from the fixed price*. You get your quote within 5 business days, so your pro forma is built on firm numbers.

The fixed price* excludes land, excavation and transport beyond 100 km from Montreal or Quebec City. Everything else (design, the technical side of permits, factory production, logistics, assembly and key handover) is covered by the signed contract. That boundary should go into your pro forma from the first model.

Let's build together.

Start your modular income property project

Bring us your lot, your pro forma or your investment project — and we'll show you how modular delivery can compress your timeline to revenue.

*Fixed price: Excludes land, excavation, and transportation exceeding 100 km from Montreal or Quebec City.